Apr 17, 2013 18:33 UTC
Latest updates[?]: South Korea picks AH-64E for 36 helicopter order.
AH-64 in Afghanistan
With the collapse of the RAH-66 Comanche program, and rededication of its funding into the Armed Reconnaissance Helicopter (ARH) and Light Utility Helicopter (LUH), and other programs, the AH-64 Apache will remain the USA’s primary attack helicopter for several more decades. Apaches also serve with a number of American allies, some of whom have already expressed interest in upgrading or expanding their fleets.
The AH-64E Guardian Block III (AB3) is the helicopter’s next big step forward. It incorporates 26 key new-technology insertions that cover flight performance, maintenance costs, sensors & electronics, and even the ability to control UAVs as part of manned-unmanned teaming (MUT). In July 2006, Boeing and U.S. Army officials signed the initial development contract for Block III upgrades to the current and future Apache fleet, via a virtual signing ceremony. By November 2011, the 1st production helicopter had been delivered. So… how many helicopters will be modified under the AH-64 Block III program, what do these modifications include, how is the program structured, and what has been happening since that 2006 award? The short answer is: a lot, including export interest and sales.
Continue Reading… »
Apr 17, 2013 17:16 UTC
Latest updates[?]: FY 2014 budget; Loss in South Korea; Article restructured & improved; AH-1Z and UH-1Y specifications added; Core industrial partners added; Budgets updated to 2018.
UH-1Y and AH-1Z
by Neville Dawson
The US Marines’ helicopter force is aging at all levels, from banana-shaped CH-46 Sea Knight transports that are far older than their pilots, to the 1980s-era UH-1N Hueys and AH-1W Cobra attack helicopters that make up the Corps’ helicopter assault force. While the tilt-rotor V-22 Osprey program has staggered along for almost 2 decades under accidents, technical delays, and cost issues, replacement of the USMC’s backbone helicopter assets has languished. Given the high-demand scenarios inherent in the current war, other efforts are clearly required.
Enter the H-1 program, the USMC’s plan to remanufacture older helicopters into new and improved UH-1Y utility and AH-1Z attack helicopters. The new versions would discard the signature 2-bladed rotors for modern 4-bladed improvements, redo the aircraft’s electronics, and add improved engines and weapons to offer a new level of performance. It seemed simple, but hasn’t quite worked out that way. The H-1 program has encountered its share of delays and issues, but the program survived its review, and continued on into production and deployment.
DID’s FOCUS articles offer in-depth, updated looks at significant military programs of record. This article covers the H-1 helicopter programs’ rationales and changes, the upgrades involved in each model, program developments and annual budgets, the full timeline of contracts and key program developments, and related research sources.
Continue Reading… »
Apr 17, 2013 13:00 UTC
Latest updates[?]: With cuts coming to the program, DID lays out the key sub-contractors; Excel download added.
UH-72As: MEDEVAC
DID’s FOCUS articles offer in-depth, updated looks at significant military programs of record. This is DID’s FOCUS Article regarding the US Army’s Light Utility Helicopter program, covering the program and its objectives, the winning bid team and industrial arrangements, and contracts.
The US Army’s LUH is a 346 (315?) helicopter program that will be worth about $2 billion when all is said and done. It aims to replace existing UH-1 Hueys and OH-58 Kiowa utility variants in non-combat roles, freeing up larger and more expensive UH-60 Black Hawk helicopters for front-line duty. In June 2006, a variant of Eurocopter’s EC145 beat AgustaWestland’s AB139, Bell-Textron’s 412EP Twin Huey, and MD Helicopters’ 902 Explorer NOTAR (No Tail Rotor) design. The win marked EADS’ 1st serious military win in the American market, and their “UH-145″ became the “UH-72A Lakota” at an official December 2006 naming ceremony.
Eurocopter has continued to field new mission kits and deliver helicopters from its Mississippi production line, while trying to build on their LUH breakthrough. Their latest effort is an armed scout AAS-72X+ offering, to try and replace Bell’s canceled ARH-70. With the LUH program winding down to its end, follow-on wins will be necessary.
Continue Reading… »
Apr 04, 2013 12:06 UTC
Latest updates[?]: A-10C test-fires APKWS guided 70mm rockets; Article improvements.
A-10A over Germany
The Precision Engagement modification is the largest single upgrade effort ever undertaken for the USA’s unique A-10 “Warthog” close air support aircraft fleet. While existing A/OA-10 aircraft continue to outperform technology-packed rivals on the battlefield, this set of upgrades is expected to make them more flexible, and help keep the aircraft current until the fleet’s planned phase-out in 2028. When complete, A-10C PE will give USAF A-10s precision strike capability sooner than planned, combining multiple upgrades into 1 time and money-saving program, rather than executing them as standalone projects. Indeed, the USAF accelerated the PE program by 9 months as a result of its experiences in Operation Iraqi Freedom.
This is DID’s FOCUS Article for the PE program, and for other modifications to the A-10 fleet. It covers the A-10′s battlefield performance and advantages, the elements of the PE program, other planned modifications, related refurbishment efforts to keep the fleet in the air, and the contracts that have been issued each step of the way.
Continue Reading… »