Eurofighter’s Future: Tranche 3, and Beyond
Apr 07, 2013 13:00 UTC by Defense Industry Daily staff
Latest update [?]
April 5/13: South Korea. An un-named military official tells the government’s Yonhap News Agency that after 2 years of discussions and negotiations with DAPA, EADS has changed its industrial offer. Instead of having the first 10 made in Europe, the next 24 made using Korean components, and the last 26 assembled in Korea, EADS has offered to build just 12 in Europe, with the other 48 Tranche 3 planes at KAI in South Korea.
The news report is imprecise, leaving the question of structural manufacturing vs. kit assembly unaddressed. It also fails to address how EADS can promote the idea of 20,000 South Korean aerospace jobs for a 5-year period, when the company also says that building the Typhoon for the much larger orders of the core country participants created just 10,000 jobs in Europe. On its face, the statement seems less than plausible, but it does point to the likelihood of significant structural manufacturing in Korea. Yonhap.
April 4/13: South Korea. The ROKAF has picked Taurus’ KEPD 350 long range cruise missile for their future fighter force. They’ll have to pay extra to integrate it with their F-16s and F-15Ks. The proposed F-15SE Silent Eagle is different enough that it will probably require added testing, so Eurofighter may garner a slight advantage from German & Spanish plans to add the KEPD 350 to Eurofighter by 2015. Read “Korea’s F-X Multi-Role Fighter Buys: Phases 2 & 3” for full coverage.
March 26/12: Tranche 3. The Tranche 3 Instrumented Production Aircraft 8 test plane has joined all major structural pieces, and moves on to the next production station on the final assembly line in Manching. Work is now focused on hydraulics, defensive aids, test flight instrumentation, and electrical systems with over 110 km of complex special cabling.
IPA8 will play an important role testing and integrating new features like the AESA radar, new weapons, etc. EADS Cassidian.
March 13/13: Denmark. The Danes pick up their fighter competition as promised, following their announced hiatus in April 2010. Invited bidders include the same set of Lockheed Martin (F-35A), Boeing (Super Hornet), and Saab (JAS-39E/F) – plus EADS (Eurofighter), who had withdrawn from the Danish competition in 2007. The goal of a 2014 F-16 replacement decision has been moved a bit farther back, and now involves a recommendation by the end of 2014, and a selection by June 2015.
The Flyvevabnet are reported to have 30 operational F-16s, with 15 more in reserve, out of an original order of 58. Past statements indicate that they’re looking to buy around 25 fighters as replacements, but there are reports of a range from 24-32, depending on price. Danish Forsvarsministeriet [in Danish] | Eurofighter GmbH | Saab | JSF Nieuws.
The above update is a recent abstract from our full article, itself part of our subscription offering. Keep reading to know more.
Italian Eurofighters
(click to view full)
The multi-national Eurofighter Typhoon has been described as the aerodynamic apotheosis of lessons learned from the twin engine “teen series” fighters that began with the F-14 and F-15, continued with the emergence of the F/A-18 Hornet, and extends through to the most recent F/A-18 Super Hornet variants. Aerodynamically, it’s a half generation ahead of all of these examples, and planned evolutions will place the Eurofighter near or beyond parity in electronic systems and weapons.
The 1998 production agreement among its 4 member countries involved 620 aircraft, built with progressively improved capabilities over 3 contract “tranches”. By the end of Tranche 2, however, welfare state programs and debt burdens hd made it difficult to afford the 236 fighters remaining in the 4-nation Eurofighter agreement. A 2009 compromise was found in the EUR 9 billion “Tranche 3A” buy, and the program has renewed its efforts to secure serious export sales. Their success will affect the platform’s production line in the near term, and its modernization plans beyond that.
Displaying 593 of 9,573 words (about 24 pages)Eurofighter: Design & Evolution
Eurofighter: Industrial Structure & Orders
Tranche 3 and Beyond: Plans & Contracts
2013
2012
2011
2009 – 2010
Eurofighter: What Next?
Additional Readings
Other Eurofighter Contracts
Eurofighter, Spain
(click to view full)
PIRATE IRST:
B-2, ICU
(click to view full)
F-35A Lightning II
(click to view full)
Eurofighter w. Paveway IIs
(click to view full)
New dawn, or twilight?
(click to view full)
Saudi Eurofighters
(click to view full)
Luftwaffen
(click to view full)
Eurofighter over Dubai
(click to view full)
Naval concept
(click to view full)
100k milestone @ Moron
(click to view full)
CAPTOR-E
(click to view full)
Future weapons array
(click to view full)
Eurofighter 2020
(click to view full)
Naval variant, cutaway
(click to view full)
Fill in the secure form below to activate your subscription right away (or pick another plan)