I-79 work tops PennDOT's full calendar The orange barrels will sprout on Interstate 79 when the warmer weather returns in spring. (2006-01-02) Tunnel inspection to begin PennDOT plans to give the Liberty Tunnels a face-lift in a couple of years and will determine how much work is required during a weeks-long inspection in January. (2005-12-30) Work won't end soon Construction work on the $2.9 million project to widen Tarentum Bridge Road in New Kensington was slated to be complete by the end of this year, but prior delays and wintry weather will be pushing it into at least June. (2005-12-23) Road to close for widening Puckety Drive, between the Cozy Inn cutoff on Route 22 and Route 66 in Murrysville/Salem Township, will close Monday and remain closed for three to four months. (2005-11-30) Spans to get revamps Crossing the Allegheny and Monongahela rivers will be more difficult for motorists the next two years while two popular bridges undergo renovations. (2005-11-29) Penn Township bridge closed A Penn Township bridge has been closed because of safety concerns. (2005-11-24) PennDOT project status updated PennDOT has updated the status of various area projects: (2005-11-21) |